From Wiring a Building to Building a Remote Power Plant
Kingsley Power was originally brought to Kapoose Creek to complete the electrical installation for an approximately 7,000-square-foot biological research facility beside Rugged Point Provincial Park in Kyuquot Sound.
As construction progressed, the scope expanded considerably. What began as wiring the building evolved into completing and integrating virtually the site's entire off-grid power infrastructure, including approximately 49 kW of solar generation, 88 kWh of lithium battery storage, three-phase inverter power, diesel generation, automatic controls, fuel systems and electrical distribution.
Greg's background in industrial electrical work, generator maintenance and commissioning provided the foundation for approaching Kapoose as a complete operating system rather than a collection of individual components. The objective wasn't simply to install solar panels and batteries. It was to build a dependable remote power plant capable of supporting the research station year-round.
Kyuquot Sound, British Columbia
~49 kW Solar · 88 kWh Lithium Storage · Three-Phase Power · Diesel Backup · 7,000 Sq. Ft. Research Facility
Complex Remote Systems Start With Proper Planning
Projects like Kapoose Creek demonstrate why remote power systems need to be considered as a whole. Site access, electrical loads, generation, battery storage, backup power, controls and long-term serviceability all influence how the system should be designed.
The assessment is the first phase of the project. If Kingsley Power is retained to supply and build the resulting system, the assessment fee can be applied toward the project.